The original provisional bridge is modified at #12-14.  The middle portion of each pontic is removed so that the bridge is seated passively before reline (Fig.6 *). 

1-Piece Last Next

Xin Wei, DDS, PhD, MS 1st edition 10/23/2015, last revision 02/03/2019